FLOORING

To Ply over concrete sub-floor

step 1

Diamond grind floor to remove construction debris, high spots and to ensure the best possible key to the slab, Vacuum floor and apply vapour barrier. Prime and level low spots.

step 2

Trowel adhesive to slab, lay full size sheets of ply (2400 x 1200mm) at right angles to planned T&G fitting. Fix with masonry anchors; leave a 3-5mm expansion gap between edges and ends of each sheet. Sand ply flat, if necessary

step 3

Fix with adhesive directly to ply and secret nail with 40 – 45mm staples. Stagger all joins.

step 4

Sand,trowel fill, fine sand and apply polyurethane coating (min, 3 coats of poly).