FLOORING

Over existing Ply/Timber sub-floor

step 1

Remove or punch down any protrusions, screw, nail and/or glue down any loose substrate. Surface sand floor to clean and remove high spots. Fill any low spots with a suitable filler and primer

step 2

Lay in the most visually appealing manner. If over existing T&G floor, apply at right angles to existing. Fix with adhesive directly to substrate and secret nail with 40 – 45mm staples. Stagger all joins

step 3

Sand,trowel fill, fine sand and apply polyurethane coating (min, 3 coats of poly).


site content © 2009 Herman Pacific Ltd site design www.buildmedia.co.nz

Floor laying guides