FLOORING

Direct to concrete

step 1

Grind floor to remove construction debris, high spots and to ensure the best possible key to the slab, Vacuum floor and apply vapour barrier. Prime and level low spots

step 2

Lay T&G into trowelled adhesive, staggering joins. Cramp and fix with masonry nails where appropriate

step 3

Sand, trowel fill, fine sand and apply polyurethane coating (min, 3 coats of poly)


site content © 2009 Herman Pacific Ltd site design www.buildmedia.co.nz