Direct to concrete
step 1Grind floor to remove construction debris, high spots and to ensure the best possible key to the slab, Vacuum floor and apply vapour barrier. Prime and level low spots
step 2Lay T&G into trowelled adhesive, staggering joins. Cramp and fix with masonry nails where appropriate
step 3Sand, trowel fill, fine sand and apply polyurethane coating (min, 3 coats of poly)
|