Battens over concrete floor
step 1Grind floor to remove construction debris, high spots and to ensure the best possible key to the slab, Vacuum floor and apply vapour barrier. Prime and level low spots
step 2Fit battens at 300 – 450mm centres to floor area and perimeter. Fix with adhesive and mechanical fixing i.e. counter sunk Dyna bolts or Hilti nails.
step 3Apply adhesive to top surface of batten and lay T&G over (preferably end matched for strength & aesthetics) . Secret fix with 40-45mm staples. Stagger all joins
step 4Sand,trowel fill, fine sand and apply polyurethane coating (min, 3 coats of poly).
|